Contact Documents Archive

Latest update

Close

Report on – 33rd IC Resolution 7: Disaster laws and policies that leave no one behind (33IC/19/R7) – Georgia

Votre État/Société nationale/institution a-t-il/elle incorporé les engagements contenus dans cette résolution dans les plans stratégiques ou opérationnels pertinents ?

Oui

Les engagements sont incorporés dans les documents suivants:
Plan opérationnel

Au National niveau

Précisions :

During the reporting period set by the IHL Implementation Action plan, within the framework of the project financed by the Green Climate Fund (GCF), in order to improve the prediction and early warning systems of natural events:

 

  • 139 units of stationary automatic stations for meteorological and hydrological observation were purchased, among which 107 units have already been installed in representative locations of Western Georgia. At present, the process of their installation and integration into the information-telecommunication system is actively being carried out in the rest of the country;
  • A high performance computer (HPC) for the weather forecasting system has been purchased and is functioning properly;
  • Modern information and communication technologies (ICT) maintenance and implementation actions in the National Environmental Agency (the Agency) were conducted;
  • Within the framework of the project 2 high-resolution meteorological radars were installed, which cover most of the territory of Georgia. This significantly improved the accuracy of predicting heavy precipitation and related floods;
  • A flood forecasting platform has been created, which currently operates in test mode – the platform is undergoing calibration and verification and implementation of hydrological and hydraulic modeling is underway. In addition, A flood modeling forecasting system has been implemented for the river basins of Western Georgia;
  • Georgia became a cooperating state of the European National Center for Medium-Term Weather Forecasts (ECMWF). The agency effectively uses the synoptic products provided by the organization in the process of preparing weather forecasts and warnings. Also, in order to improve their qualifications, the employees of the agency have the opportunity to regularly participate in training courses planned by the organization.
  • Modern geological monitoring equipment was installed throughout the country at 11 large landslide locations.
  • Geological hazards (landslide, mudflow) zoning maps were prepared for 10 major river basins of Georgia.
  • Nationwide hazard maps for floods, snow avalanches, droughts, windstorms, and hailstorms have been developed.

 

Votre État/Société nationale/institution a-t-il/elle coopéré avec d’autres partenaires aux fins de la mise en œuvre des engagements contenus dans cette résolution ?

Oui

Partenariats avec :
Société nationale de la Croix-Rouge ou du Croissant-Rouge de votre pays
Gouvernement et/ou autorités publiques

Vous êtes-vous heurté·e à des difficultés dans la mise en œuvre des engagements contenus dans cette résolution?

Non

Les engagements contenus dans cette résolution ont-ils eu une ou des incidences sur l’action et les orientations de votre État/Société nationale/institution ?

Oui

Type d’incidence :
La coopération entre le gouvernement/les autorités publiques et la Société nationale a été renforcée.
Autre

Précisions au sujet des incidences :

As a result of the implementation of the above-mentioned activities, climate forecasting and, accordingly, preventive measures of climate-induced disasters have been further refined.

Les engagements contenus dans cette résolution ont-ils eu des incidences sur les communautés auxquelles votre État/Société nationale/institution vient en aide ?

Oui

Description des incidences :

Improved disaster forecasting methods and tools are essential in the process of protecting population from climate-induced disasters. Therefore, such tools will play a major role in preventing future disasters.